Skip to main content
Loading…
This section is included in your selections.

(a) Proposed new or expanded mobile/manufactured home parks shall be subject to review under this title. Subject to findings of the proposal's conformance with the comprehensive plan and the requirements of this title, the reviewing official may grant preliminary approval of the project, enabling the applicant to meet state and city requirements for final site plan approval.

(b) The final site plan for the project, prepared by the applicant's professional designer, shall be submitted along with the applicable fee and verification that all required improvements have been completed or a surety bond has been posted in a form and amount acceptable to the city for their completion.

(c) The final site plan shall be legibly drawn, printed or reproduced at a scale appropriate to show the necessary detail, which in no event shall be less than one inch to one hundred feet, and containing at least the following:

(1) Designation of the areas and locations of all easements, streets, roads, parking areas, improvements, utilities, building envelopes, and required open spaces and permanent irrigation system to maintain open space/recreational areas that would normally require irrigation; and

(2) An accurate legal description of the property;

(3) The parcel number;

(4) A north arrow;

(5) The scale of the map;

(6) All property lines, their lengths and bearings;

(7) Signature line for the reviewing official;

(8) The notarized signature of the property owner(s);

(9) A statement signed by the local health officer that the plan meets the rules, regulations and standards of the Washington State Department of Health;

(10) Inscriptions or supplemental documents setting forth the limitations and conditions of the use of the land, or of approval, prescribed by the reviewing official;

(11) The following statement: "The spaces contained in this park shall be for the purpose of lease of manufactured or mobile home sites only. The sale of lots without prior compliance with procedures governing the subdivision of land shall constitute a violation of state and/or local laws";

(12) Designation and design details of the buffer strip, in accordance with Section 10.26.030(10).

(d) The final site plan shall be submitted to the reviewing official to be reviewed. Once approved it shall be filed with the county auditor within fourteen days.

(e) Building permits for the manufactured or mobile homes shall not be granted until the final site plan has been filed with the county auditor.

(f) Development in conformity with the approved final site plan is binding. Deviation from any condition upon which approval was granted, or from any condition shown on the approved final site plan, shall constitute a violation of this title punishable and enforceable in the manner provided for in Chapter 10.44 and Title 21. (Ord. 1634, § 97, 2004.)