(a) The approved storm water management plan shall contain certification by the applicant that all land clearing, construction, development, and drainage will be done according to the storm water management plan or previously approved revisions. Any and all permits may be revoked at any time if the construction of storm water management facilities is not in strict accordance with approved plans.

(b) A building permit for a project that includes construction of storm water facilities, alters drainage patterns, or creates more than five thousand square feet of new impervious area shall not be issued without the following:

(1) Site plan showing drainage patterns, storm water facilities, and site access point.

(2) Easements for storm water management facilities.

(3) Storm water facility inspection and maintenance agreements for private storm water facilities when so required by Section 9.23.110.

(4) Right of entry for inspections.

(5) Any off-site easements needed for storm water or drainage facilities.

(c) A final occupancy permit for a project that includes construction of storm water facilities, alters drainage patterns, or creates more than five thousand square feet of new impervious area shall not be issued without the following:

(1) Recorded easements for storm water management facilities.

(2) Recorded storm water facility inspection and maintenance agreements for private storm water facilities when so required by Section 9.23.110.

(3) Receipt of an as-built plan which includes a certification the storm drainage system complies with the original project design or a storm water management plan.

(4) Verification that UIC wells have been registered with the WDOE.

(d) A site grading permit shall not be issued or modified without the following:

(1) Right of entry for emergency maintenance of storm water management facilities, if necessary.

(2) Right of entry for inspections.

(3) Any off-site easements needed for storm water or drainage facilities.

(4) Site plan showing drainage patterns, erosion and sediment control facilities, and site access point.

(5) A WDOE-approved SWPPP for projects meeting the state regulatory threshold.

(e) In addition to other platting requirements, final plats shall not be approved until the following storm water requirements are met:

(1) Any off-site easements needed have been obtained and recorded.

(2) Any necessary drainage easements are noted on the plat.

(3) Any inspection and maintenance agreements for private storm water facilities, when so required by Section 9.23.110, are recorded.

(4) Verification that UIC wells have been registered with the WDOE.

(f) In addition to the plans and permits required by the Federal EPA and the Washington Department of Ecology, applicants shall obtain all city permits required for the proposed development. (Ord. 1799, § 1, 2010.)