AMENDED APPENDIX B PERMIT FEES

Permit Issuance

(1) For the issuance of each permit

$23.84

(2) For issuing each supplemental permit

$6.92

Unit Fee Schedule (Note: The following does not include permit issuance fee)

FURNACES

(1) For the installation or relocation of each forced-air or gravity-type furnace or burner, including ducts and vents attached to such appliance, up to and including 100,000 Btu/h

$17.47

(2) For the installation or relocation of each forced-air or gravity-type furnace or burner, including ducts and vents attached to such appliance over 100,000 Btu/h

$20.66

(3) For the installation or relocation of each floor furnace, including vent

$13.69

(4) For the installation or relocation of each suspended heater, recessed wall heater or floor-mounted unit heater

$13.69

APPLIANCE VENTS

(5) For the installation, relocation or replacement of each appliance vent installed and not included in an appliance permit

$10.32

REPAIRS OR ADDITIONS

(6) For the repair of, alteration of, or addition to each heating appliance, refrigeration unit, cooling unit, absorption unit, or each heating, cooling, absorption, or evaporative cooling system, including installation of controls regulated by this code

$18.50

BOILERS, COMPRESSORS AND ABSORPTION SYSTEMS

(7) For the installation or relocation of each boiler or compressor to and including three horsepower, or each absorption system to and including 100,000 Btu/h

$17.47

(8) For the installation or relocation of each boiler or compressor over three horsepower to and including 15 horsepower (or 3.1 to 15 tons cooling), or each absorption system over 100,000 Btu/h to and including 500,000 Btu/h

$27.90

(9) For the installation or relocation of each boiler or compressor over 15 horsepower to and including 30 horsepower (or 15.1 to 50 tons cooling), or each absorption system over 500,000 Btu/h to and including 1,000,000 Btu/h

$37.38

(10) For the installation or relocation of each boiler or compressor over 30 horsepower to and including 50 horsepower (or 30.1 to 50 tons cooling), for each absorption system over 1,000,000 Btu/h to and including 1,750,000 Btu/h

$50.49

(11) For the installation or relocation of each boiler or refrigeration compressor over 50 horsepower, (or 50.1 tons cooling or more) or each absorption system over 1,750,000 Btu/h

$84.38

AIR HANDLERS

(12) For each air-handling unit to and including 10,000 cubic feet per minute, including ducts attached thereto

$12.92

Note:   This fee shall not apply to an air-handling unit which is a portion of a factory-assembled appliance, cooling unit, evaporative cooler or absorption unit for which a permit is required elsewhere in this code.

(13) For each air-handling unit over 10,000 cfm

$17.49

EVAPORATIVE COOLERS

(14) For each evaporative cooler other than portable type

$13.21

VENTILATION AND EXHAUST

(15) For each ventilation fan connected to a single duct

$10.32

(16) For each ventilation system which is not a portion of any heating or air-conditioning system authorized by a permit

$10.32

(17) For the installation of each hood which is served by mechanical exhaust, including the ducts for such hood

$14.07

INCINERATORS

(18) For the installation or relocation of each commercial or industrial-type incinerator

$45.75

(19) For the installation or relocation of each commercial or industrial-type incinerator

$106.88

MISCELLANEOUS

(20) For each appliance or piece of equipment regulated by this code but not classed in other appliance categories, or for which no other fee is listed in this code

$10.32

(21) When Appendix B, Chapter 13 is applicable (see Section 103), permit fees for fuel-gas piping shall be as follows:

For each gas-piping system of one to four outlets

$7.99

For each gas-piping system of five or more outlets, per outlet

$3.11

(22) When Appendix B, Chapter 13 is applicable (see Section 103), permit fees for process piping shall be as follows:

For each hazardous process piping system (HPP) of one to four outlets

$3.11

For each piping system of five or more outlets, per outlet

$1.69

For each nonhazardous process piping system (NPP) of one to four outlets

$3.11

For each piping system of five or more outlets, per outlet

$0.87

(23) Wood stove/pellet stove only (no new home construction)

$34.81

Other Mechanical Inspections and Fees: (Fee is per hour)

(1) Inspections outside of normal business hours

* $76.19

(2) Reinspection fees assessed under provisions of Section 116.6, per inspection

* $76.19

(3) Inspections for which no fee is specifically indicated (minimum charge – one-half hour)

* $76.19

(4) Additional plan review required by changes, additions or revisions to approved plans (minimum charge – one-half hour)

* $76.19

*Or the total hourly cost to the jurisdiction, whichever is the greatest. This cost shall include supervision, overhead, equipment, hourly wages and fringe benefits of the employees involved.

(Ord. 2028, § 1 (Exh.A), 2017; Ord. 1913, § 2, 2013; Ord. 1730, § 4, 2008. Formerly 20.24.040.)