AMENDED TABLE J104.5 – GRADING PLAN REVIEW FEES

50 cubic yards (38.2 m3) or less

No fee

51 to 100 cubic yards (40 m3 to 764.5 m3)

$27.87

101 to 1,000 cubic yards (77.2 m3 to 764.6 m3)

$38.09

1,001 to 10,000 cubic yards (765.3 m3 to 7,645.5 m3)

$41.11

10,001 to 100,000 cubic yards (7,646.3 m3 to 76,455 m3)

$41.01 for the first 10,000 cubic yards plus $20.32 for each additional 10,000 yards (7,645.5 m3) or fraction thereof.

100,001 to 200,000 cubic yards (76,456 m3 to 152,911 m3)

$223.90 for the first 100,000 cubic yards (76,455 m3), plus $12.21 for each additional 10,000 cubic yards (7645.5 m3) or fraction thereof.

200,001 cubic yards (152,912 m3) or more

$346.05 for the first 200,000 cubic yards (152,911 m3), plus $6.16 for each additional 10,000 cubic yards (7645.5 m3) or fraction thereof.

AMENDED TABLE J104.6 – GRADING PERMIT FEES 1

50 cubic yards (38.2 m3) or less

$21.42

51 to 100 cubic yards (40 m3 to 76.5 m3)

$27.71

101 to 1,000 cubic yards (77.2 m3 to 764.6 m3)

$39.57

1,001 to 10,000 cubic yards (765.3 m3 to 7,645.5 m3)

$159.20 for the first 1,000 cubic yards (764.6 m3), plus $42.97 for each additional 1,000 cubic yards (764.6 m3) or fraction thereof.

10,001 to 100,000 cubic yards (7,646.3 m3 to 76,455 m3)

$269.17 for the first 10,000 cubic yards (7,645.5 m3), plus $57.83 for each additional 10,000 cubic yards (7,645.5 m3) or fraction thereof.

100,001 cubic yards (76,456 m3) or more

$761.00 for the first 100,000 cubic yards (76,455 m3), plus $39.48 for each additional 10,000 cubic yards (7,645.5 m3) or fraction thereof.

Other Inspections and Fees:

1. Inspections outside of normal business hours (minimum charge two hours)

$76.19 per hour*

2. Reinspection fees assessed under provisions of Section 108.8

$76.19 per hour*

3. Inspections for which no fee is specifically indicated (minimum charge 1/2 hour)

$76.19 per hour*

ADDITIONAL FEES

1. Permit fees for commercial buildings under the IBC

See Appendix L above

1The fee for a grading permit authorizing additional work to that under a valid permit shall be the difference between the fee paid for the original permit and the fee shown for the entire project.

*Or the total hourly cost to the jurisdiction, whichever is the greatest. This cost shall include supervision, overhead, equipment, hourly wages and fringe benefits of the employees involved.

(Ord. 2051, § 1, 2018; Ord. 2028, § 1 (Exh.A), 2017; Ord. 1730, § 3, 2008. Formerly 20.24.030.)