20.24.040 International Building Code, 2015 Edition.
50 cubic yards (38.2 m3) or less |
No fee |
51 to 100 cubic yards (40 m3 to 764.5 m3) |
$27.87 |
101 to 1,000 cubic yards (77.2 m3 to 764.6 m3) |
$38.09 |
1,001 to 10,000 cubic yards (765.3 m3 to 7,645.5 m3) |
$41.11 |
10,001 to 100,000 cubic yards (7,646.3 m3 to 76,455 m3) |
$41.01 for the first 10,000 cubic yards plus $20.32 for each additional 10,000 yards (7,645.5 m3) or fraction thereof. |
100,001 to 200,000 cubic yards (76,456 m3 to 152,911 m3) |
$223.90 for the first 100,000 cubic yards (76,455 m3), plus $12.21 for each additional 10,000 cubic yards (7645.5 m3) or fraction thereof. |
200,001 cubic yards (152,912 m3) or more |
$346.05 for the first 200,000 cubic yards (152,911 m3), plus $6.16 for each additional 10,000 cubic yards (7645.5 m3) or fraction thereof. |
50 cubic yards (38.2 m3) or less |
$21.42 |
51 to 100 cubic yards (40 m3 to 76.5 m3) |
$27.71 |
101 to 1,000 cubic yards (77.2 m3 to 764.6 m3) |
$39.57 |
1,001 to 10,000 cubic yards (765.3 m3 to 7,645.5 m3) |
$159.20 for the first 1,000 cubic yards (764.6 m3), plus $42.97 for each additional 1,000 cubic yards (764.6 m3) or fraction thereof. |
10,001 to 100,000 cubic yards (7,646.3 m3 to 76,455 m3) |
$269.17 for the first 10,000 cubic yards (7,645.5 m3), plus $57.83 for each additional 10,000 cubic yards (7,645.5 m3) or fraction thereof. |
100,001 cubic yards (76,456 m3) or more |
$761.00 for the first 100,000 cubic yards (76,455 m3), plus $39.48 for each additional 10,000 cubic yards (7,645.5 m3) or fraction thereof. |
Other Inspections and Fees: |
|
1. Inspections outside of normal business hours (minimum charge two hours) |
$76.19 per hour* |
2. Reinspection fees assessed under provisions of Section 108.8 |
$76.19 per hour* |
3. Inspections for which no fee is specifically indicated (minimum charge 1/2 hour) |
$76.19 per hour* |
1. Permit fees for commercial buildings under the IBC |
See Appendix L above |
1The fee for a grading permit authorizing additional work to that under a valid permit shall be the difference between the fee paid for the original permit and the fee shown for the entire project.
*Or the total hourly cost to the jurisdiction, whichever is the greatest. This cost shall include supervision, overhead, equipment, hourly wages and fringe benefits of the employees involved.
(Ord. 2051, § 1, 2018; Ord. 2028, § 1 (Exh.A), 2017; Ord. 1730, § 3, 2008. Formerly 20.24.030.)